Precision Contracting For Mission-Critical Facilities
We deliver complex general contracting, turnkey bank fit-outs, and critical infrastructure upgrades across Egypt with strict Central Bank of Egypt (CBE) compliance and zero operational downtime.
Transforming Commercial Shells into Smart Banking Hubs
From civil modifications and MEP networks to luxury imported marble and acoustic ceilings, we engineer turnkey commercial spaces under demanding residential constraints.
High-Risk Engineering Where Failure Is Not An Option
Executing mission-critical data center power upgrades under a strict 5-minute shutdown ceiling with zero banking data interruption.
General Contracting
Comprehensive turnkey civil and structural construction built strictly to Central Bank of Egypt specifications with zero downtime.
Banking Fit-Out
Specialized high-security vault installations, bulletproof partitions, counter setups, and CBE-compliant branch modernizations.
Critical Infrastructure
Heavy MEP engineering, UPS data center power backup, precision HVAC systems, and fire suppression networks.
Fast-Track Execution
Rapid 24/7 site mobilization capability engineered for high-pressure corporate timelines and aggressive delivery targets.
Building High-Reliability Infrastructure Across Egypt
Black Stone was founded on a simple yet unyielding philosophy: "Real Quality Starts Where No One Is Looking."
Founded and led by Eng. Abdou Hasaballah, the company has delivered high-stakes projects with single contract values reaching EGP 15 Million for leading institutional clients including Abu Dhabi Islamic Bank (ADIB) and Abu Dhabi Commercial Bank (ADCB).
Eng. Abdou Hasaballah
Founder & Managing DirectorFeatured Institutional Projects
Explore documented engineering challenges, turnkey execution methodologies, and verified client outcomes.
Abu Dhabi Islamic Bank (ADIB)
Low-Current & Integrated Systems Upgrade — 31 Branches
Turnkey modernization of network backbones, CCTV, fire alarms, and fire-rated security doors across 31 branches nationwide with zero operational disruption.
Abu Dhabi Commercial Bank (ADCB)
Turnkey Fit-Out of ADCB Sales Hub Branch — Smouha
Transforming a raw commercial shell in a residential building into a flagship smart sales hub under a strict 7-hour daily working window.
Abu Dhabi Islamic Bank (ADIB)
Critical 240 KVA UPS Power Replacement — GC Building
High-risk industrial power replacement under a strict 5-minute live cutover ceiling with zero financial data center disruption.
Abu Dhabi Commercial Bank (ADCB)
Fast-Track 14-Day Headquarters Reconfiguration — Mohandessin
Rapid architectural and MEP modernization of 9th floor executive offices for 120 relocating staff completed in record time.
Planning a Turnkey Contracting or Banking Fit-Out?
Our senior civil and MEP project engineers are ready to review your blueprints, conduct site surveys, and provide structured BOQ estimates.